Projects
Ongoing Project
-
Consultancy services for Authority’s Engineer for supervision of Construction of Sungal Tunnel (length 2.79km) and its approaches between km 46.450 and km 55.800 on NH-144A through Border Road Organisation (BRO), Project Sampark, in the UT of Jammu & Kashmir to be implemented on EPC mode.
-
Detail Design Engineering Consultancy Services for the Project “Construction & Upgradation to 2-lane /4lane with paved shoulder from Design Km 148+589 (Existing km 235+070) (Vailoo) to Design Km 176+532 (Existing km 263+070) Donipawa of 27.943 km length on Khellani Khanabal section of NH-244 in the Union Territory of Jammu & Kashmir on EPC mode (Pkg-VI)”.
-
Carrying out Traffic Survey, Geophysical & Geotechnical Investigation Around Pir KI Gali Tunnel for Preparation of Detailed Project Report and providing Pre- construction activities for Construction of Highway 8.5 Km. Tunnel including approaches at Pir Ki Gali Pass From Km.31.100 to Km.49.300 on Mughal road connecting Shopian with Bafliaz in Poonch District road in the Union Territory of Jammu & Kashmir.
-
Preparation Of DPR For Construction Of Road From Asha-Cheema-Gurdaligali-Apharwat-Sarson-Anita-Tristar From KM 0.00 TO KM 61.25 TO NHSL With Paved Shoulder Specifications Under 99 RCC / 760 BRTF, Project Beacon In J&K (UT).
-
Consultancy Services for Preparation of DPR including Geo-technical Investigation, NSV, FWD, Structual Design and drawings etc for Khanda - Chadoora – Charisharief – Yousmarg – Beerwah - Budgam Srinagar NH - 444 TO 2L+ Paved Shoulder Status of R&B Project Circle Division Ist Srinagar (Tentative Length = 85 Kms) in the Union Territory (UT) of J & K.


Completed Project
-
Traffic Volume Count Survey work For Construction Of Jammu to Akhnoor road To Through EPC Mode Under NHIDCL In Jammu And Kashmir.
-
SPPL has worked for the preparation of DPR of 106 Km Srinagar – Baramulla – Uri NH1A for the Company Highway Engineering Consultant/Border Road Organisation (Beacon).
-
SPPL has worked for the preparation of DPR of 127 Km Baramulla –Kupwara – Chowkibal – Chamkot NH701 for the Company Highway Engineering Consultant/Border Road Organisation (Beacon).
-
SPPL has worked for the preparation of DPR of 5 Km Jammu – Akhnoor (Package – IIIB) NH144 for the Company Anadjiwala Infra Advisory Consultant/NHIDCL.
-
Geotechnical Investigation of Jammu – Akhnoor (Package – IIIB) NH144 for the Company Anadjiwala Infra Advisory Consultant/NHIDCL.
-
Topographical survey for Preparation Of Detailed Project Report (Dpr) For Improvement Of Road Srinagar – Baramulla – Uri (Nh-1) From Km 14.200 To Km 47.200 To Nh Four Lane Specifications, From Km 47.200 To Km 57.800 To Nh Four Lane Spefcifications (Baramulla Bye Pass) And From Km 57.800 To Km 101.00 To Nh Double Lane Specification With Paved Shoulder (10 Mtr Carriage Way) In The Aor Of 53 Rcc Under 760 Brtf (P) Beacon In Jammu & Kashmir State (Length 106Kms)
-
Topographical survey for Preparation Of Detailed Project Report (Dpr) And Preconstruction Services For Newly Declared Nh-701 Rafiabad – Kupwara – Chowkibal – Tangdhar – Chamkot Road In 109 Rcc Under 32 Brtf Project Beacon In The State Of Jammu & Kashmir (Length 127Kms).
-
Topographic Survey and stacking out of the proposed Centre Line required for the Preparation of Detailed Project Report and providing Pre-Construction activities :
-
For construction of Approach Roads with Avalanche Protection Works to West and East portal of the proposed Zojila Tunnel between (between Baltal and Minamarg) from km 82.00 to km 95.00 on Srinagar-Leh road (NH-1) and;
-
Geotechnical Investigation of Construction of Uni-Directional Khellani Tunnel of length 1.574 Km & its approach Road from Km 29.030 to Km 31.449 of total length of 2.419 Km on NH-244 in Union Territory of Jammu & Kashmir on EPC Mode (PKG-III).
-
Preparation of Topographical Map/Site Plan including L-section and X-section of river from Shahi khul Surankote to kalai bridge and from Kali bridge to S.K bridge Poonch approx. Length 40 KM by way of conducting detailed survey. (Irrigation & Flood Control Poonch).
-
Detailed Topographical Survey for Rehabilitation, Strengthening and four Laning of Srinagar to Banihal section from Km 187.000 to Km 189.350 (Banihal bypass) & Km 220.700 to Km 286.110 of NH-1A on DBFOT (Annuity Basis) in the state of Jammu & Kashmir. (Length 65.400Kms).
-
For making the NH-1 from Z-Morh Tunnel to proposed Zojila Tunnel (approx. 20 km) all weather road in the State of Jammu & Kashmir.
-
Topographical survey for Preparation Of Detailed Project Report (Dpr) And Preconstruction Services For Akhnoor to Poonch NH Road Project Beacon In The State Of Jammu & Kashmir (Length 208Kms).
-
Topographical survey for Preparation Of Detailed Project Report (Dpr) For Improvement Of Road Srinagar – Baramulla – Uri (Nh-1) From Km 24.250 To Km 33.750 To Nh Four Lane Specifications Pattan Bye Pass (Length 9.5Kms).
-
Marking of gauge and providing Cross Section across river Chenab near steel bridge at padyrana, Kishtwar – Chenab Valley Power Projects Pvt. Ltd.
-
Topographical survey for Preparation Of Detailed Project Report (Dpr) And Preconstruction Services For Improvement of road Rafiabad – Kupwara – Chowkibal – Tangdhar – Chamkot (NH – 701) of Proposed Bypass’s. (Length 24 Kms).
-
Conducting Topographical Survey by taking Cross Sections across river Chenab near Dam Site of Kiru HEP, Kishtwar- Chenab Valley Power Projects Pvt. Ltd.
-
Conducting of Plate Load Test (PLT) in Banihal and Budgam Railway Station yards for RE Civil works in USBRL Project J & K.
-
Geotechnical Investigation of NH-1 from Z-Morh Tunnel to proposed Zojila Tunnel (approx. 20 km) all weather road in the State of Jammu & Kashmir
-
Geotechnical Investigation of Up-gradation to Two lane with Paved shoulder from Km. 20+300 to Km.29+030 of 8.730 Km length on Goha-Khellani section on NH-244 in Union Territory of Jammu & Kashmir.
-
Topographical Survey of Up-gradation to Two lane with Paved shoulder from Km. 20+300 to Km.29+030 of 8.730 Km length on Goha-Khellani section on NH244 in Union Territory of Jammu & Kashmir.
-
Providing Consultancy Services of Various Power Sub Stations (district Baramulla and Kupwara) in the Union Territory of J and K.
-
Preparation of Topographical Map/Site Plan including L-section and X-section of river from Shahi khul Surankote to kalai bridge and from Kali bridge to S.K bridge Poonch approx. Length 40 KM by way of conducting detailed survey. (Irrigation & Flood Control Poonch).
